Elbphilharmonie Hamburg
The Elbphilharmonie is a concert hall in the HafenCity quarter of Hamburg, Germany, on the Grasbrook peninsula of the Elbe River. It is one of the largest and most acoustically-advanced concert halls in the world.
Having first been proposed in 2003, it was only completed in 2016 and was officially inaugurated with concerts and a lightshow on 11 January 2017.
Designed by Swiss architectural practice Herzog & de Meuron, the building comprises a large, quartz-like glass structure sitting on top of an existing brick warehouse. With a maximum height of 108 m (354 ft), it is the tallest inhabited building in Hamburg.
The structural strength of the old warehouse was enhanced to bear the weight of the new addition, which is identical in plan form but rises up like a wave from the eastern to western end. The glass façade, consists of flat, curved, and 'carved' open panels, and can have images projected onto it. The façade also changes appearance during the day through its reflection of the sky, water and surrounding city.
The building complex contains a philharmonic hall, a chamber music hall, restaurants, bars, residential apartments, a hotel, and a terrace with panoramic views of Hamburg.
[edit] Find out more
[edit] Related articles of Designing Buildings Wiki
Featured articles and news
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from constructuon and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.
The increasing costs of repair and remediation
Highlighted by regulator of social housing, as acceleration plan continues.
Free topic guide on mould in buildings
The new TG 26/2024 published by BSRIA.
Greater control for LAs over private rental selective licensing
A brief explanation of changes with the NRLA response.
Practice costs for architectural technologists
Salary standards and working out what you’re worth.
The Health and Safety Executive at 50
And over 200 years of Operational Safety and Health.
Thermal imaging surveys a brief intro
Thermal Imaging of Buildings; a pocket guide BG 72/2017.